CMR Consignment Note and e-CMR Explained: What Forwarders and Hauliers Must Get Right
CMR explained for forwarders and hauliers: what the note must contain, the 8.33 SDR limit in euros, claim deadlines, and where e-CMR is accepted in 2026.
A pallet of electronics worth €60,000 goes missing between Poznań and Lyon. The shipper expects €60,000. The carrier’s insurer offers about €5,000. Neither side is being unreasonable: they are reading the same CMR consignment note, and the note never said the goods were worth more than the standard limit.
Most CMR disputes are decided by what was written on the note, or left off it, on the day of loading. This guide covers what the note must contain, where liability really sits, the deadlines that kill claims, and where the electronic e-CMR is accepted in 2026.
Short answer: The CMR consignment note is the standard contract document for international road freight between countries that signed the CMR Convention. It is made out in three originals: one each for the sender, the goods and the carrier. Carrier liability for loss or damage is capped at 8.33 SDR per kilogram, roughly €10 per kg. Claims expire after one year. The electronic e-CMR has the same legal value in the 42 countries that have joined its protocol.
What CMR covers, and when it applies
CMR is the 1956 United Nations Convention on the Contract for the International Carriage of Goods by Road. It applies automatically to every paid road transport where the place of loading and the place of delivery are in two different countries and at least one of them is a party to the Convention. The nationality of the companies does not matter.
Three kinds of transport are excluded: carriage under international postal conventions, funeral consignments and furniture removals.
Two points matter in daily work:
- CMR is mandatory law. A contract clause that lowers the carrier’s liability below the Convention’s terms is void.
- The contract exists even without the note. Under Article 4, a missing, irregular or lost consignment note does not cancel the contract or take it outside CMR. The note is evidence, not the contract itself. Still, without it you lose your best evidence.
The three copies: who keeps which
Article 5 requires three originals, signed by the sender and the carrier:
| Copy | Goes to | Why it matters |
|---|---|---|
| First | Sender (shipper) | Proof of what was handed over, and how it looked at loading |
| Second | Travels with the goods to the consignee | The consignee signs it on delivery; this is where reservations are written |
| Third | Carrier | Proof of delivery for invoicing, and the carrier's defence in any claim |
In practice most printed CMR sets have four or five copies, with extras for the forwarder or the subcontractor. Only the three signed originals carry the Convention’s weight. If a load is split across several trucks, or contains different kinds of goods or lots, each can need its own note.
What the CMR note must contain
Article 6 lists what goes on the note. These particulars are mandatory:
- Date and place the note is made out
- Names and addresses of the sender, the carrier and the consignee
- Place and date of taking over the goods, and the place of delivery
- The ordinary description of the goods and their packing; for dangerous goods, their recognised description
- Number of packages, their marks and numbers
- Gross weight or other quantity
- Charges for carriage, customs duties and other charges
- Instructions for customs and other formalities
- A statement that the carriage is subject to CMR, whatever any other clause says
Where they apply, the note should also state: a ban on transshipment, charges the sender pays, a cash-on-delivery amount, a declared value or special interest in delivery, insurance instructions, the agreed delivery time and a list of documents handed to the carrier.
Under Article 7, the sender is liable for costs and damage caused by wrong or incomplete particulars. If the shipper writes “general cargo, 2 pallets” for 18 tonnes of steel coils, the carrier is not the one who pays for that mistake.
Reservations at loading: the carrier’s only protection
When taking over the goods, the carrier must check the number of packages, their marks and their apparent condition (Article 8). If anything is wrong, or cannot reasonably be checked, the driver writes a reservation on the note, with the reason. Examples: “3 pallets with torn shrink-wrap”, “shipper’s load and count, sealed trailer, contents not checked”, “pallets wet on arrival”.
The rule that follows is simple and harsh. Under Article 9, if the note has no reservations, the goods and packaging are presumed to have been in good condition, and the package count correct, when the carrier took them over. A driver who signs a clean note for a damaged pallet has just agreed the damage happened on his truck.
Train drivers to write reservations in plain words, to photograph the goods before closing the doors, and never to sign for a sealed load as if they had counted it.
Liability: what the carrier pays, and the limits
The carrier is liable for total or partial loss of the goods, damage to them, and delay, from taking over to delivery (Article 17). It is relieved only in defined cases: the claimant’s own fault or instructions, inherent vice of the goods, circumstances it could not avoid, and a list of special risks such as defective packing or loading done by the sender. A defective truck is never an excuse.
The 8.33 SDR limit, in euros
Compensation for loss is capped at 8.33 SDR per kilogram of gross weight missing. The SDR (special drawing right) is the IMF’s unit of account. In November 2026, one SDR was worth about €1.23, so the limit is roughly €10.20 per kilogram.
That is why the electronics example at the top ends badly. A 500 kg pallet gives a maximum of about 8.33 × 500 × €1.23, or around €5,100, whatever the goods were worth. A full 24-tonne load of the same goods would be capped at about €246,000.
On top of the per-kilogram amount, the carrier refunds the carriage charges, customs duties and other charges paid for the transport.
Delay
Delay means delivery after the agreed time or, with no agreed time, later than a diligent carrier would reasonably need. Compensation for proven loss caused by delay is capped at the carriage charges (Article 23). If the freight was €1,800, a missed production line slot cannot cost the carrier more than €1,800 under CMR.
When the limits fall away
- Declared value or special interest (Articles 24 and 26). If the sender declares a higher value or a special interest in delivery on the note, and pays the agreed surcharge, the limit rises to that amount. This is the clean way to ship high-value goods.
- Wilful misconduct (Article 29). If the loss was caused by wilful misconduct, or a fault the court treats as equal to it, the carrier cannot rely on the limits at all. Courts in different countries draw this line differently, and leaving a loaded trailer unattended in an unsecured lay-by is the classic argument.
Deadlines that decide claims
| Situation | What the consignee must do | Deadline |
|---|---|---|
| Visible loss or damage | Write a reservation on the CMR note | At delivery, before signing |
| Hidden loss or damage | Send written reservations to the carrier | Within 7 days of delivery (Sundays and public holidays not counted) |
| Delay | Send a written reservation to the carrier | Within 21 days of the goods being placed at the consignee's disposal |
| Any court claim | Start proceedings | 1 year (3 years for wilful misconduct) |
For total loss, the one-year period starts 30 days after the agreed delivery date or, without one, 60 days after the carrier took over the goods. A written claim to the carrier suspends the period until the carrier rejects it in writing. Diarise both dates; a strong claim filed on day 366 is worth nothing.
Taking delivery without reservations is treated as evidence that the goods arrived as described on the note. Consignees who sign first and check later make every claim harder.
For forwarders: are you the carrier?
CMR places liability on the carrier, and the carrier is the party that contracts to carry the goods, not only the company that owns the truck. Depending on national law, a forwarder that accepts a transport order in its own name and quotes a fixed freight price can be treated as the contracting carrier, liable under CMR for the subcontractor it hires.
Three practical consequences:
- Check the wording of your orders and terms. “Organising transport as an agent” and “carrying goods for a fixed price” are different legal positions.
- Hold CMR carrier’s liability insurance if you act as contracting carrier, not only forwarder’s liability cover.
- Vet subcontractors properly: licence, CMR insurance with a valid policy number, and a named driver and plate. Freight fraud with stolen identities is common on load boards.
e-CMR: the electronic consignment note in 2026
An Additional Protocol to CMR, adopted in 2008 and in force since 2011, gives an electronic consignment note the same legal value as paper. The sender, carrier and consignee sign and see the same record on an app or platform, with time stamps, GPS position and photos.
Accession sped up in 2026. Albania, North Macedonia, Montenegro and Serbia all joined this year, and the Protocol entered into force for Serbia on 2 November 2026. By our count of the UN depositary list, 42 countries are now parties, including Germany, France, Italy, Spain, Poland, Austria, Hungary, Czechia, Slovakia, Slovenia, Romania, Bulgaria, the Netherlands, Denmark, Finland, Sweden, Norway, Switzerland, the UK, Ukraine and Türkiye. Belgium has signed but not ratified, and runs e-CMR as a pilot.
Among EU members, Croatia, Cyprus, Ireland and Malta had not joined when we checked.
When can you drop the paper?
- Use e-CMR alone when the countries of loading and delivery have both joined the Protocol, and the parties have agreed to use it.
- On routes to, from or through a country that has not joined, carry a paper note as well, or be ready to print one. Roadside officers there may not recognise the electronic version.
- Check that your provider’s platform meets the Protocol’s requirements for authentication and integrity, and that the consignee can actually sign on delivery.
What eFTI changes in July 2027
The EU’s electronic freight transport information regulation, known as eFTI, deals with the other side: the authorities. From 9 July 2027, Member State authorities must accept information shared electronically by operators via certified eFTI platforms. It does not force companies to go digital, but it removes the main excuse for paper at roadside checks. If you plan to switch to e-CMR, choose a provider that intends to certify as an eFTI platform.
The most common CMR mistakes
- Driver signs a clean note for damaged or uncounted goods
- Gross weight missing, or copied from the order instead of the scale ticket
- The “carrier” box names the forwarder, while a subcontractor actually drives
- No declared value on high-value loads, so the 8.33 SDR limit applies
- Consignee signs before checking, then reports damage a day later without a written reservation
- The 7-day deadline for hidden damage and the 21-day deadline for delay are missed
- e-CMR used on a route into a country that has not joined the Protocol, with no paper backup
Next step
If you quote international jobs, build toll costs into the price with our country-by-country guide to EU truck tolls in 2026. If empty return legs are eating your margin, read our guide to why European trucks run empty and how to cut empty kilometres.
Sources and last check: CMR Convention text (Articles 1, 4–9, 17, 19, 23, 24, 26, 29, 30, 32) and its 1978 Protocol (SDR limit); UN depositary notifications and Fieldeas’ list (updated 25 August 2026) for e-CMR accessions; Transfollow and trans.info on the 2026 accessions; European Commission on eFTI application dates; Xe for the SDR-to-euro rate in November 2026. All checked on 19 November 2026. This guide is general information, not legal advice; for a disputed claim, ask a transport lawyer in the relevant country.
Frequently asked questions
Is a CMR consignment note mandatory?
The Convention requires the contract to be confirmed by a consignment note, but a missing or lost note does not cancel the contract or take it outside CMR. In practice the note is your main evidence and is checked at roadside controls, so international road transports between CMR countries should always carry one, on paper or as e-CMR.
How much is the CMR liability limit in euros?
The limit is 8.33 SDR per kilogram of gross weight missing. With one SDR worth about €1.23 in November 2026, that is roughly €10.20 per kilogram. The carrier also refunds carriage charges and duties. A higher limit applies only if a value or special interest was declared on the note.
How long do I have to make a CMR claim?
Visible damage must be noted at delivery; hidden damage needs written reservations within 7 days, excluding Sundays and public holidays; delay needs a written reservation within 21 days. Court proceedings must start within one year, or three years where the carrier's wilful misconduct caused the loss.
Which countries accept e-CMR in 2026?
42 countries have joined the e-CMR Protocol, including most EU members, the UK, Switzerland, Norway, Ukraine, Türkiye and, since 2026, Albania, North Macedonia, Montenegro and Serbia. Among EU members, Croatia, Cyprus, Ireland and Malta had not joined, and Belgium has signed but only pilots it.
Does CMR apply to domestic transport?
Not automatically. The Convention covers carriage where loading and delivery are in different countries. Some countries apply CMR-style rules to domestic transport through their own law, and contracts can refer to CMR voluntarily, but a purely domestic job is governed by national law unless agreed otherwise.